I. A.1 DEMERSAL RESOURCES SURVEY, ASSESSMENT AND MONITORING OF FISH STOCKS ALONG NORTH MAHARASHTRA AND GUJARAT COAST BETWEEN LAT. 18°N - 23°N

Project Coordinator

Shri Ashok S. Kadam, Fisheries Scientist

Project Components

  • Exploratory survey of Demersal resources using fish trawl in 100 – 500 m depth.
  • Monitoring of Demersal resources using fish trawl in 30-100 m depth.
  • Exploratory survey using shrimp trawl in 30-100 m depth.
  • Experiments for assessment of fishing gear efficiency.
  • Mesh selectivity studies with cod-end cover.

Period : April 2021 - March 2022

Project Objectives

  • Preparation of species inventory of Demersal finfish and shellfish resources.
  • Estimation of abundance indices of Demersal resources and major components thereof with emphasis on Sciaenids, Threadfin breams, Catfish, Bulls eye, Barracuda. Ribbon fish, Horse mackerel, Scads, Squids and Cuttlefish.
  • Identifying spatio-temporal distribution pattern of above resources.
  • Study of biological aspects of important resources.
  • Stock assessment of important species/resources.
  • Study of suitable mesh size for important species.
Survey and Research Team
Project Leader Project Associates
Scientist (s) Engineer (s)
Shri Ashok S. Kadam, Fisheries Scientist

Dr. Dewanand E. Uikey

Sr. Scientific Assistant

Shri. A. V. Tamhane,

Sr. Scientific Assistant

Dr. Harshavardhan D. Joshi,

Sr. Scientific Assistant

Shri S. Kanthen,

Service Engineer (Mech.)

Base of operation : Mumbai
Vessel : Matsya Nireekshani

Gear

  • 34 m Fish trawl (FT)
  • 45 m Shrimp trawl (ST)

Vessel Officers

Skipper : Shri. G. Gopikrishnan (Skipper in-charge)
Fishing Engineer : Vacant

Survey Strategy

  • Stratified random sampling
  • The survey area to be divided into two sectors viz.
    • Sector I (Lat18°N - 20°N)
    • Sector II (Lat 20°N - 23°N)
  • Survey cruises to be conducted alternatively in each sector. In each cruise, sampling shall begin from the farthest Latitude as far as possible.
Distribution of sampling effort
Particulars Exploratory Survey Monitoring survey
Gear FT ST FT ST
Depth zone (M) 100-500 100-500 30-100 30-100
Extent of area (Km2) 14590 14590 97735 97735
No. of hauls 10 10 10 20

Operational target per cruise

Days out as Sea: 20
Fishing days: 16
No. of hauls: 50
Duration of haul: 90 minutes

Survey area: (Lat. 18°N - 23°N)

Survey Area

Result reporting: As per Annexure – II

I.C.1 TUNA RESOURCES SURVEY USING MONOFILAMENT LONGLINING ALONG THE WEST COAST OF INDIA BETWEEN LAT. 4°N AND LAT. 23°N

Project Coordinator

Shri A. S. Kadam, Fisheries Scientist

Project Component

Survey of oceanic tunas and allied resources using monofilament longlining between Lat. 4°N and 23°N.
Period : April 2021 to March 2022

Project Objectives

  • Estimation of abundance indices of oceanic tuna and allied resources.
  • Identifying spatio-temporal distribution pattern of the tuna and allied resources.
  • Study of biological parameters in respect of important species.
  • Stock assessment of important resources.
  • Study of oceanographic parameters.
  • Imparting training in fishing techniques and demonstrations of modern equipment onboard to the fishermen, fishing industry representatives and entrepreneurs.
Survey and Research Team
Project Leader Project Associates
Scientist (s) Engineer (s)

Shri A. S. Kadam,

Fisheries Scientist

Dr. Dewanand E. Uikey

Sr. Scientific Assistant

Shri. A. V. Tamhane,

Sr. Scientific Assistant

Dr. Harshavardhan D. Joshi,

Sr. Scientific Assistant

Shri S. Kanthen,

Service Engineer (Mech.)

Base of Operation : Mumbai
Vessel : Matsya Vrushti

Vessel Officers

Skipper : Shri D. Mehalingam
Chief Engineer Gr. I : Vacant

Gear

Monofilament long line with 7/8 hooks per basket.

Survey Strategy

  • The survey area to be divided into four sectors viz.
    • Sector I (Lat 4°N - 9°N), Sector II (Lat 9°N - 14°N),
    • Sector III (Lat 14°N - 18°N) and Sector IV (Lat 18°N - 23°N).
  • Survey cruises will be conducted alternatively in each sector.

Operational target per cruise

Days Out at Sea : 20
Fishing days : 12/14/16
Hooks per set : 630

Distribution of sampling effort
Sector Area Months No. of sets per cruise
I Lat. 4°N – 9°N 1,3 12
II Lat. 9°N – 14°N 4,12 14
III Lat. 14°N – 18°N 5,7,8 16
IV Lat. 18°N – 23°N 6,10,2 16

Survey area: Lat. 4°N-23°N

Survey Area

Collection of Environmental Data

Besides the catch and biological data being collected in longline survey, data on environmental parameters will be collected as follows:

  • Salinity, Temperature and Depth (STD) data per day per set.
  • Sea Surface Temperature (SST) data at specific time, one observation per set especially during immersion.
  • Data on current direction and speed, one observation every day (sets are to be made at specific depth).
  • Secchi disc observation (3 readings) for every set made after setting the line.

Result reporting: As per Annexure – II

I E. 1 ANNUAL PLANNED MAINTENANCE PROGRAMME FOR MATSYA NIREEKSHANI – 2021-22
Description Apr 21 May 21 Jun 21 Jul 21 Aug 21 Sep 21 Oct 21 Nov 21 Dec 21 Jan 22 Feb 22 Mar 22
Dry-docking & Afloat Repairs                        
Main Engine                        
Aux. Engine Main     O                  
Aux. Engine (H) O                      
Generator(P)                        
Generator(S)                        
Ref. Compr – I                        
Ref. Compr – II                        
Bait room Compressor                        
General Maintenance                        

O- Overhauling # Inspection/Minor Repair /// SSS – Dry-docking/ Afloat Repairs, GM- General Maintenance.
All other machinery Repairs/minor works as and when required.

I E.10. ANNUAL PLANNED MAINTENANCE PROGRAMME FOR MATSYA VRUSHTI- 2021-22
  Apr 21 May 21 Jun 21 Jul 21 Aug21 Sep 21 Oct 21 Nov 21 Dec 21 Jan 22 Feb 22 Mar 22
Dry-docking & Afloat Repairs                        
Main Engine               O        
Aux. Engine(P)           O            
Aux. Engine(S)                        
Habour Engine                        
Generator(P)                        
Generator(S)

 

                       
Ref. Compr – I                        
Ref. Compr – II                        
Bait room Compressor                        
General Maintenance                        

O- Overhauling # Inspection/Minor Repair /// SSS – Dry-docking/ Afloat Repairs, GM- General Maintenance.
All other machinery Repairs/minor works as and when required.